Is it reasonable to bypass the geothermal heat exchanger during the transition period?
airflow, which conducts from outside

This question still is controversially discussed. Pluggit doesn’t consider it reasonable to bypass the geothermal heat exchanger for the following reasons:
1. A constant air flow prevents the growth of mould fungi. Hygienists urgently recommend ensuring a constant air flow.
2. The point that, despite the building’s heat demand, the outside air may possibly be cooled is unfounded in terms of new buildings (low heating limit temperature) in connection with the excellent heat recovery of the Avent ventilation systems
3. High additional costs are not justifiable, because of the above mentioned reasons.