Hannover, Lauenauer Straße, Altbausanierung

In 2007 the Oberricklingen building cooperative started the energy-efficient modernisation of the apartment building with five flats on a living area of about 300 square metres on two storeys.

In 2007 the Oberricklingen building cooperative started the energy-efficient modernisation of the apartment building with five flats on a living area of about 300 square metres on two storeys. In the course of modernisation the entire electric system was also replaced; kitchen, bathroom, combination boiler and balcony were restored and a new screed was installed. Upon the recommendation of a specialist firm a Pluggit room ventilation system with heat recovery was installed.


Hannover Lauenauerstr.


Project data

Year of construction : 1960

Area : 5 apartments, 300qm2

Location : Hannover

Planning : Heizungsbau Peter Haucke Completion

Heizungsbau : Peter Haucke

Technical data : AR100 with ring distribution system

The ground plan of the apartment

The Avent R100 is locally covered, matching the surroundings in the kitchen.

The maintenance flaps allow for a quick and uncomplicated cleaning or exchange of the filter.

The iQoanda outlet, which supplies the rooms with fresh air, is placed above the door.

The used air is continuously extracted in the bathroom.

The ducts of the distribution system in the hallway are circularly installed and thus allow for an optimal air distribution.

Print preview

0 Article in print folder

renovation renovation
new-building new buildings